Laserfiche WebLink
D. As this is important for bonding calculations,please refer to the Reclamation Plan for a <br /> description of how the highwalls will be reclaimed because for the most part they will <br /> be reclaimed using in-place materials using cut and fill rather than only backfilling. <br /> Possible Historical Site in Southwestern Corner of Permit: <br /> 1. In the southwestern corner of the permit an area has been identified that may contain <br /> an unconfirmed Native American burial site. The State Archaeologist has been <br /> informed of this. This small parcel will not be mined or disturbed until it is <br /> professionally confirmed that the anecdotal evidence is false. <br /> Fountain Pit Technical Revision#3 - June 2022 M-1982-155 Mining Plan Page 6 of 22 <br />