Laserfiche WebLink
Details of the Mining Plan <br /> The following detailed plans follows the same arrangment as that used in the Condensed List <br /> at the start of this exhibit. <br /> THESE DETAILS CONSTITUTE THE OFFICIAL PLAN. The Condensed List list is lust a <br /> brief summary of finer details included here. <br /> Clarification of MAPPED Boundary Definitions <br /> Over the years,there seems to have developed some confusion as to what mapped boundaries <br /> actually mean with respect to this operation. From the time that this Technical Revision is approved <br /> until these definitions are changed,the following shall apply. This section is primarily for the benefit <br /> of the mine operators. <br /> Permit Boundary: ON THE MAP, this is defined by a very bold dashed red line that follows the <br /> property boundary in most areas but in some places excludes portions of the property that are clearly <br /> not included in the Mining Operation or where lands were mined and reclaimed and subsequently <br /> released. The location of the boundary is defined by either fence lines or by specifically placed large <br /> diameter plastic pipe poles placed at suitable intervals, especially at corners, along the boundary <br /> where fences do not exist to indicate the boundary. THIS BOUNDARY IS FIXED. It can only be <br /> changed by an amendment to the permit. No disturbances related to the mining operation can be <br /> made outside this boundary. <br /> Affected Land Boundary: ON THE MAP,this is defined by a bold dashed magenta line that in some <br /> places follows the permit boundary but in other places defines the limit of meaningful disturbances <br /> (affected land)made by the mining operation until such time as those disturbances are fully reclaimed <br /> and released from bond. It may also include land that will be disturbed in the future in accordance <br /> with the Mining Plan. On the east side,this boundary follows the western side of the Colorado Springs <br /> Utilities Easement Boundary defined by legal description and is generally 50't 5'from the most <br /> westerly power poles, as shown on easement maps and documents included in this Technical <br /> Revision, as amended. THIS BOUNDARY IS SEMI-FIXED.When operating next to the boundary <br /> small incursions into the adjacent land may occur, if subsequently reported on the annual report map <br /> and bonded, but only where the Permit Boundary and Affected Land Boundary are not in the same <br /> Fountain Pit Technical Revision#3 - June 2022 M-1982-155 Mining Plan Page 7 of 22 <br />