Laserfiche WebLink
iI <br />I <br />r <br />r <br />~_ <br />I_ <br />r <br />~_ <br />CONSTRUCTION STEPS <br />I. CONSTRUCT TRENCH FOR PIPE. <br />2. PLACE AND COMPACT CLAY BELOW CRADLE. <br />3. CONSTRUCT TRENCH TO. FORM BOTTOM OF ANTI-SEEP COLLAR. <br />4. POUR BOTTOM PORTION OF ANTI-SEEP COLLAR EXTENDING STEEL UPWARD <br />THROUGH JOINT. <br />5. POUR BOTTOM PORTION OF CRADLE WITHOUT ANY CONSTRUCTION JOINTS. <br />6. SET PIPE ON CRADLE. <br />7. WRAP PIPE WITH MASTIC JOINT FILLER AND POUR TOP POR710N OF CRADLE <br />WITH CONSTRUCTION JOINTS AT PIPE JOINTS. <br />8. FORM AND POUR TOP PORTION OF ANTI-SEEP COLLAR. <br />9. BACKFILL AND COMPACT AS SPECIFIED. <br />CONSTRUCTION JOINTS <br />AT PIPE JOINT (OPTIONAL <br />-, :. <br />I" <br />I <br />~. <br />L <br />L <br />NO CONSTRUCTION <br />JOINTS IN BOT70M <br />PORTION OF CRADL <br />STEP 8 <br />STEP 5 <br />STEP 6 <br />STEP T <br />CONSTRUCTION JOINTS <br />STEP 4 <br />LONGITUDINAL CONSTRUCTION <br />DETAIL OF ANTI-SEEP <br />COLLAR AND CRADLE <br />N. T S. <br />02520-9 <br />L <br /> <br /> <br />