My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-06-24_PERMIT FILE - C1980007 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2022-06-24_PERMIT FILE - C1980007 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2022 11:37:28 AM
Creation date
6/30/2022 11:29:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
6/24/2022
Section_Exhibit Name
EXHIBIT 68 Major Building & Structures As-Built Summary
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ No excavation shall be made in frozen material without written approval 01' • <br />the Engineer. No additional allowance above the unit prices per cubic yard <br />bid in the schedule for excavation will be made on account of any materials <br />being wet or frozen. <br />r_ B. Excess Excavation <br />i Any and all excess excavation for the convenience of the Contractor, or <br />over-excavation performed by the Contractor for any purpose or reason <br />~ except as may be ordered in writing by the Engineer, and whether or not due: <br />to the fault of the Contractor, shall be at the expense of the Contractor.. <br />Where required to complete the work all such excess excavation and over• <br />- excavation shall be refilled with materials furnished and placed at the; <br />expense of and by the Contractor. <br />3.05 Structural Excavating and Trenching <br />~. A. General <br />All excavation of every description and of whatever substance encountered <br />shall be performed as required by the lines and grades indicated on the plans. <br />Where no specific limits of excavation for structures or trenches are called <br />for, the excavation shall be accomplished in accordance with standard <br />practices pertinent to the work being performed. The excavation shall be: <br />held to the minimum required for proper performance of the work„ <br />However, if in the opinion of the Engineer additional excavation is required <br />to properly perform the work, this additional excavation may be required.. <br />~._ Where excavation is being performed in unstable materials subject to <br />sloughing or "cave-in", the Contractor shell provide and use whatever <br />sheeting, shoring or cribbing as may be required to properly protect the work <br />and insure safe working conditions. Where excavation requires "blasting" or <br />_ other hazardous operations, the Contractor shall exercise due care to <br />protect all adjacent property, both public and private, and shall protect the <br />Owner from all claims resulting from these operations. <br />All suitable material removed from the excavations shall be used, insofar as <br />passible, in the formation of embankments, fills, baclcfilling, and for such <br />_ other purposes as are called for on the plans or directed by the Engineer. <br />Material deemed unsuitable for these purposes shall be disposed of on the: <br />site as called for on the plans or directed by the Engineer. <br />The Contractor is expected to familiarize himself completely with the type <br />of excavation to be performed and the type of material to be handled. <br />-- 3.06 Backfrlling Around Structures <br />A. General <br /> <br />Backfr7ling around structures shall be accomplished using only earth <br />materiels subject to the restrictions on material type indicated on the <br />Drawings. Materials shall be free from roots, stones, wood, broken • <br />concrete, frozen chunks or debris of any kind. Prior to backfilling, the <br />I <br />L <br />L ozzoo-s <br />
The URL can be used to link to this page
Your browser does not support the video tag.