My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-06-24_PERMIT FILE - C1980007 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2022-06-24_PERMIT FILE - C1980007 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2022 11:37:28 AM
Creation date
6/30/2022 11:29:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
6/24/2022
Section_Exhibit Name
EXHIBIT 68 Major Building & Structures As-Built Summary
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />_ - 2. Atterberg Limits shall comply with the following criteria: <br />- Liquid Limit: 30% or greater • <br />Plasticity Index: 15% or greater <br />These tests are to be performed in accordance with AASHTO T89 and <br />T90. <br />_- 3. Permeability on Remolded Sample: 4 x IO-8 (CM/Sec) Maximum <br />B. Type 2 Material <br />The Contractor shall use on-site materials which are in reasonable <br />conformance with the following gradations end properties. Imported <br />material used to augment Type 2 material supplies will not be approved <br />- unless it conforms to the following criteria: <br />1. Gradation shall conform to the following: <br />Size (mm) Sieve % Passing <br />2.38 #B 95- 100% <br />- l.ls #ls ao- loo% <br />o.5so #30 70- so% <br />0.297 #50 60- 80% <br />0.149 #100 45- 65% <br />i_ 0.074 #200 35- 50% •. <br />0.037 15- 35% <br />0.019 8 - 20% <br />0.009 0 - 5% <br />This test is to be performed in accordance with AASHTO T27. <br />~_ 2. Atterberg limits shall comply with the following criteria: <br />Liquid Limit: 20to 30% <br />Plasticity Index: 6 to 15% <br />L. <br />These tests are to be performed in accordance with AASHTO T89 and <br />T90. <br />3. Permeability on Remolded Sample: 6 x 10 7 (CM/Sec) Maximum <br />C. Type 3 Material <br />The Contractor may be able to use on-site materials from the area near the <br />river to obtain this material. He should be cognizant of the fact that most <br />on-site material used for Type 3 material shall conform to the following <br />criteria: <br />'-- 1. Gradation shall conform to the following: • <br />._ <br />02200-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.