My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-06-24_PERMIT FILE - C1980007 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2022-06-24_PERMIT FILE - C1980007 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2022 11:37:28 AM
Creation date
6/30/2022 11:29:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
6/24/2022
Section_Exhibit Name
EXHIBIT 68 Major Building & Structures As-Built Summary
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
" Runoff Ponds (Y1B#1, VIB#2, and MB#3) <br /> Freshwater Pond (FW#1) • <br />Tn the event that the scope of any one work item of the project changes significantly ( a <br />signifi cant change would be an increase or decrease of 10% or greater in the quantity of <br />any on e item), the following unit prices will be used where applicable. <br />_ TABLE OF UNIT PRICES <br /> Add-on and Deletion <br /> Item Unit Price <br />1. Common Excavation at the price of Dollars $ <br />. - <br />and Cents ($ -~ per cubic yard. <br />2. Backfill and compaction of Type 1 :Material, complete in $_ <br /> _ <br />place, to 95% Standard Proctor Density at the price of <br />_ Dollars and Cents <br />~ ($ )per cubic yard. <br />3. Backfill and compaction of Type 2 material, complete in $ <br />.~ place, to 95% of maximum Standard Proctor Density at the <br /> price of Dollars and <br /> Cents (S )per cubic yard. <br /> • <br />4. Rock excavation at the price of Dollars $ <br /> and Cents (; per cubic yard. <br />r <br />5. 6" perforated PVC (SDR 35) toe drain pipe, in place, includingS <br /> __ <br />pipe and filter materials at the price of <br /> Dollars end Cents (; _ per <br /> cubic yard. <br />6. Class III riprap, complete in place, at the price of $ <br /> Dollars and Cents <br /> ($ )per cubic yard. <br />i 7. Type 3 filter material, complete in place, at the price of S <br />_ Dollars and <br /> Cents ($ )per cubic yard. <br />I 8. Type 4 filter material, complete in place, at the price of $ <br /> Dollars and <br /> Cents $ )per cubic yard. <br />i <br />9. <br />Filter fabric, complete in place, at the price of $ <br /> Dollars and Cents <br /> ($ )per square yard. <br />10 4" P <br />d PVC d <br />f <br />t <br />t <br />l <br />t <br />i <br />i <br />l <br />~ <br />. er <br />ora <br />ewa <br />e <br />er <br />ng system, comp <br />e <br />e <br />n p <br />ace, $ <br />~ including pipe, Filter sand and filter fabric at the price of <br />~ Dollars and <br /> Cents (S_ )per linear foot. <br />
The URL can be used to link to this page
Your browser does not support the video tag.