Laserfiche WebLink
Runoff Pond No. 1 <br />(MB#1) <br />BID SCHEDULE (Continued) <br />• Description, Approximate Quantity and Unit and Lump Sum <br />Item No. Price in Words and Figures Total Price <br />11. Outlet pipe energy dissipator, complete in place, including $ <br />- concrete, steel and all other miscellaneous items at a <br />lump sum price of Dollars <br />and Cents. <br />Approximate Quantities: <br />Concrete: 6.52 cubic yards <br />_ Reinforcing Steel: 346 pounds <br />12. Inlet pipe energy dissapator, complete in place, including 5 <br />_ steel and concrete at a lump sum price of <br />Dollars and Cents. <br />Approximate Quantities: <br />- Concrete: 27.5 cubic yards <br />Reinforcing Steel: 1,666 pounds <br />- 13. Concrete outlet pipe, complete in place, including anti- S <br />seep collar, cradle, compaction, pipe and other incidentals <br />- required, at a lump sum price of <br />~~ Dollars and Cents. <br />- Approximate Quantities: <br />Concrete: 11.8 cubic yards <br />- Reinforcing Steel: 1,400 pounds <br />_ 18" A Concrete Pipe: 90 linear feet <br />- 14. Ductile iron pipe, (transfer line to transfer control structure) 5 <br />complete in place, including pipe and antiseep collars at a <br />- lump sum price of Dollars and <br />-. Cents. <br />- Approximate Quantities: <br />Concrete: 2.43 cubic yards <br />Reinforcing Steel: 290 pounds <br />- 8" 9 Ductile iron pipe: 220 linear feet <br />TOTAL COST IN WORDS: <br />DOLLARS AND CENTS <br />TOTAL COST IN FIGURES: <br />5 <br />The estimated quantities listed above are provided to assist the Contractor in assessing <br />the scope of each lump sum item. These quantities are the Engineer's estimated <br />quantities and should be considered approximate only. The Contractor shall verify all <br />• quantities and satisfy himself es to the actual quantities required to construct these <br />facilities as indicated on the drawings. <br />