Laserfiche WebLink
ARCO COAL COMPANY <br />MT. GUNNISON NO. 1 MINE <br />EARTHWORK PACKAGE <br />C~ <br />~~ <br />ADDENDUM NO. 2 <br />January 5, 1981 <br />The following shall become as fully a part of the above-named Drawings, <br />Specifications and Bid Documents as if therein written and shall take full and complete <br />precedence over anything therein contained to the contrary. <br />Each bidder shall indicate on the proposal form his acknowledgment of thi <br />Addendum. <br />Each bidder shall be responsible for reading each item of this Addendum to <br />ascertain to what extent and in whet manner it affects the work to be performed. <br />1. Section 02200, Page 02200-1 <br />Ponds; add the following: <br />~ecifications for Runoff Ponds and Freshwater <br />E. Density tests performed on compacted soils to determine compliance with <br />these specifications shall be performed at the direction and expense of the <br />Owner. Nuclear Density Tests will be acceptable for homogeneous fill areas <br />if at least one Sand Cone Density Test is performed for every ten Nuclear <br />Density Tests. The Sand Cone Density Test must be taken adjacent to the <br />preceding Nuclear Density Test. <br />Classifications and compaction curves to be used with the Nuclear Density <br />Test shall be taken and submitted prior to construction. The classification <br />will also include a description of soil properties, including color, as well as <br />the information required under part D of this section. <br />2. <br />02520-7 Typical Anti-Seep Collar Construction Detail for Pipe Without <br />Cradle. <br />02520-8 Typical Anti-Seep Collar and Concrete Cradle Detail Pipe with <br />Cradle. <br />02520-9 Longitudinal Construction Deta>7 of Anti-Seep Collar and Cradle. <br />3. All Plan Sets for Runoff Ponds and Freshwater Ponds, Outlet Works Details; Make <br />the following changes to the Plans: <br />Adjust location of all stem guides on stems of sluice gates as Collows: The un- <br />supported length of the stem is to be equally divided. The unsupported length of <br />the stem is not to exceed 8 feet. <br />4. Freshwater Pond No. 1, Pr~ect No. MG-02-04 (FW#1), Drawing No. C-010; Change <br />In the plan view at the top of Drawing No. C-010, Project No. MG-02-04, the <br />• dimension for the distance the Rip Rap extends south of the control tower shall be <br />changed from 5'-0" to 15'-0": <br />