Laserfiche WebLink
ADDEiJDUi4 iJo. 1 <br />1. Contractor is required to chip and stockpile all vegetation <br />for use as mulch material in our subsequent revegetation <br />efforts. All disturbance to vegetation and wildlife shall <br />be I:ept to a minimum. <br />2. ARCO will be responsible for all revegetation work at the <br />init. Gunnison F1ine. The Contractor shall rip all final grade <br />surfaces ~•rhich will be revegetated, These operations, plus <br />vegetation removal and topsoil removal and replacement, should <br />be coordinated with the on-site Environmental Coordinator <br />before actual t~,ork begins. The Environmental Coordinator will <br />then contract for and oversee the actual seedbed preparation, <br />planting and mulching operations so that they are in accord <br />with the best reclamation techniques and regulatory requirements. <br />~• <br />12/24/80 <br /> <br />