Laserfiche WebLink
• ADDENDUM No. 1 <br />1. Contractor is required to chip and stockpile all vegetation <br />for use as mulch material in our subsequent revegetation <br />efforts. A71 disturbance to vegetation and wildlife shall <br />be kept to a minimum. <br />2. ARCO will be responsible for all revegetation work at the <br />Mt. Gunnison Mine. The Contractor shall rip ail• final grade <br />surfaces which will be revegetated. These operations, plus <br />vegetation removal and topsoil removal and replacement, should <br />'~ be coordinated with the on-site Environmental Coordinator <br />before actual work begins. The Environmental Coordinator will <br />then contract for and oversee the actual seedbed preparation, <br />- planting and mulching operations so that they are in accord <br />with the best reclamation techniques and regulatory requirements. <br />r <br />I_ <br />~~ <br />r <br />12/24/80 <br />L~ <br />L <br />L <br />