Fuel will be brought to the site by a mobile fueling truck and will be housed in the tanks. No <br /> permanent structures will be built within the permit area as part of this operation. <br /> Water will be used to control dust on the excavation and disturbed areas of the site. Water for <br /> this operation will be trucked to the site and purchased from an offsite source. It is estimated that <br /> the operation will consume 8,000 gallons of water per day for dust suppression. Portable plants <br /> will be used onsite for rock crushing and asphalt production. Spray bars will be used in the <br /> crushing and screening plant to further minimize dust. <br /> Aggregate processing equipment is portable, and the processing area may move and follow <br /> active mining throughout the site; however, the processing area will likely remain in the <br /> southwest corner of the site. Portable mining equipment such as loaders, dozers, trucks, and <br /> excavators will be serviced on an as-needed basis onsite. Upon reclamation, all portable <br /> equipment will be removed from the site. A summary of equipment and related tanks that may <br /> exist on site at any given time is listed below. <br /> - A portable asphalt plant with associated tanks <br /> - Truck scales <br /> - Equipment parking and maintenance <br /> - A portable crusher with associated tanks <br /> - 250-gallon diesel fuel tank in secondary containment(110% of tank capacity) <br /> - Portable lights with a generator for emergency after hours maintenance support <br /> The following list is the best estimate of equipment that will be used onsite throughout the mine <br /> life: <br /> - 1-2 Front end loaders <br /> - Crushing and screening plant <br /> - 1 4000-gallon water truck <br /> - 15 and 24 ton on-road haul trucks(number will depend upon production needs) <br />