My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-06-16_PERMIT FILE - M2022030
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2022030
>
2022-06-16_PERMIT FILE - M2022030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2025 2:38:09 AM
Creation date
6/21/2022 10:11:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2022030
IBM Index Class Name
Permit File
Doc Date
6/16/2022
Doc Name
Application
From
A & S Construction Company
To
DRMS
Email Name
NCG
JDM
SMS
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C MINING PLAN <br /> 1. General Mining Plan <br /> The Existing Conditions Map shows the current conditions of the Cheyenne County State Land <br /> Board Pit. The pit will serve as a material source, aggregate, borrow and sand, for road <br /> construction work on Colorado Project No. NHPP38511-018/23513 to resurface and improve State <br /> Highway 385, less than 1 mile from the site. Mining will disturb less than 20 acres delineated on <br /> the Mining Map. <br /> Mine access is via County Road DD with access from State Highway 385. Mining of the 12-15- <br /> foot-thick gravel deposit will progress to the north and west from the site access location and hot <br /> plant, stockpile, and processing areas located in the southeast corner of the site. The pit will be <br /> regraded to 3H:1 V slopes, or shallower, in a manner that restores the site to its pre-mining <br /> drainage pattern. <br /> The operation will exist as a long raw material for road base and asphalt is needed for the road <br /> construction job. A portable asphalt hot plant will be in the southeastern corner of the site, see <br /> Mining Map for location. This area, as well as the stockpile and processing areas, will be <br /> prepped by removing and stockpiling topsoil for later reclamation. Mined and processed <br /> aggregate will be stored surrounding the hot plant area and the portable processing plant will be <br /> located east of the asphalt hot plant and aggregate stockpiles. <br /> 2. Mining Timetable <br /> The construction project is anticipated to August 2022, depending on weather. Mining is <br /> planned to begin August 2022. <br /> 3. Mine Facilities and Operation <br /> It is extremely unlikely that any toxic or acid-producing materials will be encountered during the <br /> mining operation as the site was historically rangeland. However, if such materials are <br /> encountered, they will be covered with subsoil and topsoil from onsite stockpiles to the same <br /> depths outlined in the reclamation plan and no more mining will occur in the area. No blasting <br /> or explosives will occur/be used during mining nor on site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.