Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task#03B Page 2 of 3 <br /> Payload Capacity: 10.73 LCY <br /> Truck Bed(volume)Basis: <br /> Struck Volume: 10.00 LCY <br /> Heaped Volume: 12.00 LCY <br /> Average Volume: 11.00 LCY <br /> Adjusted Volume: 10.73 LCY <br /> Final Truck Volume Based on Number of Loader Passes: 8.25 LCY <br /> Loading Tool Capacity <br /> Bucket Size Class: NA <br /> Rated Capacity: 5.000 LCY(heaped) <br /> Bucket Fill Factor: 0.825 Blasted rock-avg.blasted (75-90%)0.825 <br /> Adjusted Capacity: 4.125 LCY <br /> Job Condition Corrections: Site Altitude(ft.): 5100 feet <br /> Truck Loader Source <br /> Altitude Adj: 1.000 1.000 (CAT HB) <br /> Job Efficiency: 0.830 0.830 (CAT HB) <br /> Net Correction: 0.830 0.830 <br /> Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill Truck: 2 passes <br /> Excavators and Front Shovels: <br /> Machine Cycle Time vs.Job Condition Rating: NA <br /> Selected Value within this Basic Rating: NA <br /> Track Loaders—Material Description: <br /> Cycle Time Elements(min.): <br /> Load: NA Maneuver: NA Dump: 0.100 <br /> Wheel and Track Loaders-Unadjusted Basic Loader Cycle Time(load,dump,maneuver): 0.500 minutes <br /> Cycle Time Factors Factor(min.) Source <br /> Material: Material 3/4"to 6"diameter 0.00 0.000 (Cat HB) <br /> Stockpile: Conveyor or dozer piled 10 ft.high and up 0.00 0.000 (Cat HB) <br /> Truck Ownership: Common ownership of trucks and loaders-0.04 -0.040 (Cat HB) <br /> Operation: I Constant operation-0.04 -0.040 1 (Cat HB) <br /> Dump Target: I Nominal target 0.00 0.000 (Cat HB) <br /> Net Cycle Time Adjustment: -0.080 minutes <br /> Adjusted Loader Cycle Time: 0.420 minutes <br /> Net Load Time per Truck: 0.520 minutes <br /> Truck Cycle Time: <br /> Truck Exchange Time: 0.50 Minutes Adjusted for site altitude: 0.500 Minutes <br /> Truck Load Time: 0.520 Minutes Adjusted for site altitude: 0.520 Minutes <br /> Truck Maneuver and Dump Time: 0.90 Minutes Adjusted for site altitude: 0.900 Minutes <br /> Truck Travel(Haul&Return)Time: Road Condition:Rutted dirt,little maintenance,no water,2"tire <br /> penetration 5.0 <br /> CIRCES Cost Estimating Software <br />