My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-06-13_REVISION - M1996076
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1996076
>
2022-06-13_REVISION - M1996076
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2022 1:05:14 PM
Creation date
6/13/2022 11:04:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1996076
IBM Index Class Name
Revision
Doc Date
6/13/2022
Doc Name
Notice of Surety Increase
From
DRMS
To
Rudolph Fontanari
Type & Sequence
SI6
Email Name
ACY
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 3 <br /> TRUCK/LOADER TEAM WORK <br /> Task description: Backfill NE pit w/stockpile <br /> Western Slope Flagstone Permit Action: <br /> Site: Quarry No.2 SI-6 Permit/Job#: M1996076 <br /> PROJECT IDENTIFICATION <br /> Task#: 03B State: Colorado Abbreviation: None <br /> Date: 6/2/2022 County: Mesa Filename: M076-03b <br /> User: ACY <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST Shift basis: 1 per day <br /> Equipment Description <br /> Truck Loader Team-Truck: Generic 10-12 cy,6x4 <br /> -Loader: CAT 966H high lift <br /> Support Equipment-Load Area: Cat D8T-8SU <br /> -Dump Area: Cat D8T-8SU <br /> Road Maintenance—Motor Grader: NA <br /> -Water Truck: NA <br /> Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br /> Truck Loader Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 100 10 50 NA NA <br /> Ownership cost/hour: $22.87 $59.72 $97.46 $97.46 NA NA <br /> Operating cost/hour: $44.28 $55.20 $9.76 $48.82 NA NA <br /> %Utilization-riper: NA 0 NA NA NA NA <br /> Ripper own.cost/hour: NA $0.00 $0.00 $0.00 NA NA <br /> Ripper op.cost/hour: NA $0.00 $0.00 $0.00 NA NA <br /> Operator cost/hour: $0.00 $35.97 $40.04 $40.04 NA NA <br /> Unit Subtotals: $67.15 $150.89 $147.26 $186.31 NA NA <br /> Number of Units: 4 2 1 1 0 0 <br /> Group Subtotals: Work: $570.38 Support: $333.57 Maint: $0.00 <br /> Total work team cost/hour: $903.95 <br /> MATERIAL QUANTITIES <br /> Initial volume: 23,135 CCY Swell factor: 1.245 <br /> Loose volume: 28,803 LCY <br /> Source of estimated volume: 30-35'H 0.49 ac pile <br /> Source of estimated swell factor: Cat Handbook <br /> Material Purchase Cost: $0.00 <br /> Total Cost: $0.00 <br /> HOURLY PRODUCTION <br /> Truck Capacity <br /> Truck Payload(weight)Basis: <br /> Material weight: 3,300 Pounds/LCY <br /> Description: Basalt <br /> Rated Payload: 35,400 Pounds <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.