Laserfiche WebLink
(iii) Fertilization—Fertilizer or other soil amendments will be added <br /> to the replaced topsoil if soil tests indicate the need. The local SCS may be <br /> contacted to determine their recommendations prior to topsoil replacement. <br /> (iv) Revegetation—The proposed reclamation for this site to non- <br /> irrigated pasture/rangeland does not include trees or shrubs. <br /> (v) Topsoiling—will be completed with the material of topsoil and <br /> overburden that has been stockpiled around the perimeter of the area and <br /> shall be spread over the affected lands from two (2)to six (6) inches deep. <br />