Laserfiche WebLink
Chapter 13.1 TR-130 does not require the preparation of an EIS. <br /> 6. Any change in the mining operations and reclamation plan that would result in a change in the <br /> postmining land use where the surface is Federally-owned. <br /> There is no proposed change in the postmining land use. <br /> The OSMRE's determination is based upon consideration of Trapper's Permit Application Package <br /> and the requirements at 30 CFR Parts 740 and 746. <br /> On May 25th, 2022 OSMRE consulted with the Bureau of Land Management(BLM) about TR-130. <br /> The BLM agree with OSMRE's reasoning that TR-130 does not constitute a mining plan <br /> modification requiring approval by the ASLM. <br /> The OSMRE's decision does not relieve DRMS from coordinating its review and approval of this <br /> action and securing approval from other Federal agencies for compliance. <br /> Sincerely, <br /> MARCEL Digitally signed by <br /> MARCELO CALLE <br /> O CALLE 06:36:501-06'00'7 <br /> Marcelo Calle, Chief <br /> Program Support Division <br /> cc: Jennifer Maiolo, BLM <br /> Graham Roberts, Trapper Mining, Inc. <br /> Howard Strand, OSMRE <br /> ' Major actions normally requiring the preparation of an EIS are described in the DOI Department Manual(DM),Managing <br /> the NEPA Process—Office of Surface Mining(516 DM 13). <br />