Laserfiche WebLink
shoreline for reclamation. However, this can be accomplished with a dozer by pushing the material <br /> in place to create the final reclamation contours, therefore negating the need for backfill. The total <br /> lake exposure between these four ponds will be 36.3 acres, which is within the existing well permit <br /> limits, as can be seen in Table 1. <br /> For Pit 5, backfilling of the pond will occur slowly over many years as waste concrete is available. <br /> The maximum pond size if the pit is 4.2 acres based on the current state of the pit as of April 2022. <br /> A pond of this size is covered in the current gravel well permit as can be seen in Table 1. No <br /> topsoiling or revegetation will take place at Pit 5. <br /> All the material required for backfilling and topsoiling is available on site in stockpiles from pre-mine <br /> stripping and will not need to be bought and trucked on site. <br /> 23 Road Pit Technical <br /> Revision 3 ®Lewicki 81 Associates <br /> April 2022 <br />