Laserfiche WebLink
TR-19 updated the as-built map and appendix to reflect the downsizing reconstruction of Ponds <br /> NHN-001 and NHN-002. TR-19 was issued February 5, 2019. <br /> TR-20 updated section 3.02.2 to reclamation cost estimate and bond schedule information and <br /> remove outdated references to Western Fuels-Colorado and New Horizon No. 1. TR-20 <br /> removed maps and an appendix from the permit that were no longer relevant. TR-20 was issued <br /> August 13, 2019. <br /> TR-21 revised the water monitoring plan to remove two surface water monitoring sites. These <br /> two sampling sites were outside the permit area, and no longer relevant to the reduced permit <br /> area. TR-21 was issued November 12, 2019. <br /> TR-22 proved an updated As-Built certification for Pond NHN-001. TR-22 was issued March <br /> 31, 2020. <br /> TR-23 approved removal the east ditch liner in Segment 6 of the ditch. TR-23 was issued April <br /> 7, 2020. <br /> TR-24 revised the surface and groundwater monitoring program at New Horizon North Mine. <br /> TR-24 was approved May 4, 2021. <br /> Minor Revisions <br /> MR-1 incorporated the Air Pollution Control Division's Compliance Order on Consent. MR-1 <br /> was issued on November 2, 2012. <br /> MR-2 proposed to incorporate the As-Built configuration and professional certification for <br /> Sediment Pond NHN-001. MR-2 was withdrawn on January 30, 2013. <br /> MR-3 proposed to add a new Section 2.05.3(6)(a) - Overburden Blasting to the permit. MR-3 <br /> was withdrawn on March 7, 2013. <br /> MR-4 incorporated a Substitute Water Supply Plan into the permit. MR-4 was issued on April <br /> 10, 2013. <br /> MR-5 updated the reclamation cost estimate and mine facilities sections of the permit to <br /> incorporate a water well. MR-5 was issued on June 18, 2013. <br /> MR-6 incorporated a Compliance Order on Consent issued by the Air Pollution Control <br /> Division. MR-6 was issued on May 17, 2013. <br /> MR-7 incorporated four well permits into the permit. MR-7 was issued on July 19, 2013. <br /> MR-8 incorporated Construction Permit No. 1 OMO2275F into the permit. MR-8 was issued on <br /> August 26, 2013. <br /> 6 <br />