My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-08-09_PERMIT FILE - C1981019A (5)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2021-08-09_PERMIT FILE - C1981019A (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2023 7:19:26 PM
Creation date
4/26/2022 2:58:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
8/9/2021
Doc Name
Volume 1 Rule 4
Section_Exhibit Name
4.01 Through 4.30
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 4 PERFORMANCE STANDARDS <br /> <br />Rule 4 Performance Standards 4-36 Revision Date: 7/20/21 <br /> Revision No.: MR-235 <br />seam will obviously be greater than 180 days. As the operation advances, backfilling will be as <br />contemporaneous as practical but not so as to interfere with removal of the lower-most coal seam. <br />Colowyo will rough backfill and grade as shown on the Spoil Grading Map (Map 29) by <br />methodically and actively dumping and backfilling overburden in the West and East pits very close <br />to final contour so that minimal work will be needed to complete final re-grade of these areas in <br />the future. All disturbed areas will be returned to the approximate original contour by grading and <br />backfilling with the use of a dragline, trucks, dozers, scrapers and dozers assisting a dragline. <br />Additional detail of the backfilling and grading for the mining operation is set forth in the <br />discussion under Sections 2.05.3 and 2.05.4. <br /> <br />The area to be mined will be restored to a topography approximating premining grades. The <br />outslopes of the completed fill in Streeter Draw and areas backfilled, as necessary, will utilize <br />terraces and/or contour furrows for erosion control and stability. These terraces and contour <br />furrows will be constructed according to the requirements outlined in Section 2.06.2. Where <br />applicable, Colowyo will retain all overburden and spoil on the solid portion of existing benches. <br />The final graded slopes will not exceed the approximate original premining slope grade as shown <br />on the Postmining Topography Map (Map 19). Postmining surface drainage channels will be <br />located to minimize erosion and to minimize slippage. <br /> <br />The final pit highwalls will be eliminated in Section 16 by backfilling X seam overburden materials <br />from the West Pit mining area to achieve the final topography. Rehandle of the X seam overburden <br />will be occur concurrently with the advance of the multiple-seam advance during the 2003-2010 <br />period. Also, as mining advances into the final pit, the working area on the pit spoil side will <br />decrease to a point where insufficient spoil room below the proposed postmining contours is <br />available. When that point is reached, material will be temporarily placed above the proposed <br />postmining topography. When the final pass of the West Pit is mined out, this temporarily-placed <br />spoil will be rehandled concurrently with Section 16 virgin and rehandle material to fill and slope <br />the pit to the configuration shown on Map 19 (Postmining Topography). Because the area will be <br />redisturbed by the rehandle activities, that portion of the north end of Section 16 that is above final <br />grade will not be topsoiled or otherwise reclaimed until final reclamation. <br /> <br />Final reclamation of the East Pit will take place via the sequence shown on Map 29 (Spoil Grading <br />– South Area) with the reclamation blocks advancing from east to west or from the topographic <br />bottom to the topographic top of the mining areas. Just as in the West Pit, all disturbed areas will <br />be returned to approximate original contour by grading and backfilling with the use of draglines, <br />trucks, dozers, scrapers and dozers assisiting a dragline. As reclamation of the East Pit progresses, <br />all non-reclaimed areas will be contained so that any residual runoff from these areas will be <br />isolated within the remainder of the East Pit. All methods of erosion control and stability such as <br />contour ditches, contour furrows, internal ditches and internal sumps will be established on an as- <br />needed basis to ensure the integrity of the Prospect Pond and the surrounding areas include the <br />final East Pit Ditch. Closure of the East Pit is dependent on the final reclamation and closure of <br />the West Pit as the western most portion of the East Pit will tie-in with the West Pit in this area. <br /> <br />A haulroad corridor from the Administration/Shop area to the South Taylor Pit will remain in place <br />until final reclamation is completed in that area. The corridor is sufficient in width to provide a <br />material balance as the corridor is regraded to the post mine topography. The
The URL can be used to link to this page
Your browser does not support the video tag.