My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-08-09_PERMIT FILE - C1981019A (5)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2021-08-09_PERMIT FILE - C1981019A (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2023 7:19:26 PM
Creation date
4/26/2022 2:58:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
8/9/2021
Doc Name
Volume 1 Rule 4
Section_Exhibit Name
4.01 Through 4.30
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 4 PERFORMANCE STANDARDS <br /> <br />Rule 4 Performance Standards 4-35 Revision Date: 7/20/21 <br /> Revision No.: MR-235 <br />by dragline, and 55% by truck/shovel. Since all mining at Colowyo was conducted by truck/shovel <br />methods through 1979, the life-of-mine swell factor has continued to increase. <br /> <br />Example: 363 feet overburden, 47 feet coal, (these conditions are found along the western edge of <br />the pit in 1988), 20% swell factor <br /> <br /> 363 feet + 20% swell = final thickness = 1.06 <br /> 363 feet + 47 feet initial thickness <br /> <br />Example: 356 feet overburden, 49 feet coal (these conditions are found along the western edge of <br />the pit in (1988), 20% swell factor <br /> <br /> <br /> 356 feet + 20% swell = final thickness = 1.05 <br /> 363 feet + 49 feet initial thickness <br /> <br />The original permit application utilized at 17% swell factor to project the anticipated postmining <br />topography. <br /> <br />During the initial permit review process the anticipated swell factor was subsequently revised to <br />23% to allow for sufficient pit development. At that time, excess swell was anticipated to raise <br />the elevation of the postmining topography by about 5.3 feet, compared to the premining <br />topography. As explained above, in 1984, as part of the 1983 Annual Report, Colowyo further <br />refined its estimates based on measurements to date, and currently uses an overall 20% swell factor <br />for estimating purposes. As indicated in the Annual Reports, the stripping accomplished by <br />draglines can vary from 40% to 45% and from 55% to 60% for truck/shovel. Swell factor will <br />continue to be monitored and the postmining topography adjusted, if necessary. Any adjustments <br />will be minor, will be done gradually and will not affect the reclamation plan or postmining land <br />use. Particularly, drainage channel gradients will not be changed; an entire drainage channel <br />elevation could possibly be revised, but the gradient would remain as designed. If a change would <br />be necessary, the dump plan elevations would be revised as appropriate. <br /> <br />The mining plan, as described in Section 2.05.3, was a soundly designed and engineered open pit <br />mining plan, which maximized coal conservation and recovery while minimizing adverse <br />environmental impacts. Because of the multi-seam mining configuration used by Colowyo, an <br />exemption from the 180 day or four spoil ridge limitation was and still is necessary. The mining <br />plan was designed as a continuously moving open pit operation with the mine advancing <br />approximately parallel to the dip of the numerous coal seams. The mining operation progressed <br />from a southward direction with shovels/trucks/ proceeding along the entire length of the mining <br />area uncovering the upper coal seams and the draglines uncovering the lower coal seams. With <br />the numerous benches used in an open pit operation, the mine area was opened for some time, and <br />backfill and grading operations are occurring now in the West Pit. <br /> <br />As the mining operations remove coal seams (In the southward progression), the mining area must <br />be left open until such time as the lower-most coal seam can be recovered. With the mining <br />configuration, the time differences between mining the upper-most seam versus the lower-most
The URL can be used to link to this page
Your browser does not support the video tag.