Laserfiche WebLink
6. <br /> D. There will be 10 pits on Site#1( If reset of pits is approved -6 if not)and 20 pits on Site#2 for a total of 30 <br /> pits. Each pits will be 30 ft.wide with a disturbance area of 706 ft.There is 7,000 yards out of each pit, <br /> 1,000 yards of pay will be hauled to wash plant the rest will be stock piled next to pit.Total yards of pay is <br /> 30 pits x 1,000 yards=30,000 out of all pit to be ran.A total of 350 pound of concentrate will be taken off <br /> site. Top soil will be set aside for reclamation. Pay will be ran though the wash plant,then returned to pit <br /> to be returned the same way it came out.All reclamation will bled in with surrounding area. Each pit will <br /> be reclaimed before the next pit is started to prevent any unnecessary or undue degradation. <br /> F. All fuel cans for tracker and wash plant will be kept in a secure container as not to create a hazard.There <br /> are no chemicals on the mining site. <br /> *Bar Star Land has been notified of your request that the Road access is not revoked. James Ingalls General <br /> Counsel,Adam Davenport,adam.davenport@barstarland.com,will be sending a letter or notifying you. I have <br /> not received any terminating notice and am in good standing with Bar Star Land LLC. <br />