My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-04-25_PERMIT FILE - M2022019
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2022019
>
2022-04-25_PERMIT FILE - M2022019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2022 9:34:31 AM
Creation date
4/25/2022 9:35:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2022019
IBM Index Class Name
Permit File
Doc Date
4/25/2022
Doc Name
Application
From
Oldcastle SW Group, Inc. dba United Companies
To
DRMS
Email Name
LJW
THM
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT E RECLAMATION PLAN <br /> 1 . General Reclamation Plan <br /> The total disturbed area to be reclaimed under this permit is 26.7 acres. Reclamation plans can <br /> be viewed on Map F-1. The post-mining land use will be rangeland. Pre mine land use has been <br /> rangeland. The site is zoned as Wrights Mesa Rural Agricultural land, and therefore the post <br /> mine land use fits in with local land use plans. No state land plans are known for the site. All <br /> slopes will be reclaimed to 3H:1V or shallower. As described in the mining plan, reclamation will <br /> occur concurrently with mining. <br /> Topsoil and overburden stockpiled prior to mining will be used to reclaim mined out areas. Six to <br /> 14 inches of topsoil will be replaced on all graded areas for an average depth of nine inches. <br /> Slopes will be mined to the final reclaimed condition. Concurrent mining will minimize the <br /> acreage that is unreclaimed which will make the worst-case reclamation smaller and thus, the <br /> bond will be smaller. <br /> 2. Reclamation Timetable <br /> The time for reclamation is shown below—Table E-2. Exhibit L: Reclamation Costs describes <br /> the worst case bond scenario. <br /> Table E-2 Reclamation Timetable <br /> Activity Time <br /> N!p,in4 first half Years 1-13 <br /> Final reclamation of site Years 25-26 <br /> Skelton Pit <br /> January 2022 E-1 ®Lewicki&Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.