My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-04-20_REVISION - M2021052
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2021052
>
2022-04-20_REVISION - M2021052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2022 8:45:12 PM
Creation date
4/21/2022 9:58:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021052
IBM Index Class Name
Revision
Doc Date
4/20/2022
Doc Name
Request For Amendment To Permit
From
IHC Scott, Inc
To
DRMS
Type & Sequence
AM1
Email Name
CCW
THM
SMS
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rifle Gravel Pit #1 April 2022 <br /> 13.0 Exhibit L — Reclamation Costs <br /> Reclamation details are provided in Figure 14, Exhibit E1 and Figure 15, Exhibit E2. The <br /> pond will not be backfilled, but will remain as open water. A 6-foot wide 5:1 wetland slope <br /> will be constructed on the inner perimeter of the pond, transitioning to 3:1 slopes to full <br /> depth. Reclamation costs are also associated with reclamation activities on the perimeter <br /> berm, the 25-foot wide upland buffer on the outside of the perimeter berm, and the <br /> reclamation of the Operations Area. Volumes, areas, and seeding mixes are provided in <br /> Figure 15, Exhibit E2. <br /> • Backfill of the pond to create the 0.79 acres of wetland reclamation area, utilizing <br /> approximately 637 CY of salvaged fill and topsoil, at a cost of$3/CY = $1,911 total. <br /> • Seeding and Planting of the 0.79 acres of wetland reclamation area with the Wetland <br /> Seeding and Planting Mix, at a cost of$10,000/ac = $7,900 total. <br /> • Construction of perimeter berms on 3.90 acres, utilizing approximately 12,163 CY of <br /> salvaged fill and 2,390 CY of salvaged topsoil, at a cost of$3/CY = $36,489 total. <br /> • Replace 2,390 CY of salvaged topsoil on the perimeter berms at a cost of$3/CY = <br /> $7,170 total. <br /> • Seeding and erosion control on the 3.90 acres of perimeter berms, using the Upland <br /> Seeding and Planting Mix, at a cost of$1000/ac= $3,900 total. <br /> • Removal of gravel surface and regrading of Operations Area, placement of topsoil, <br /> and seeding with Upland Seeding and Planting Mix on 1.93 acres, at a cost of <br /> $5,000/ac = $9,650 total. <br /> Based on these costs, and a 28% DRMS cost factor, the total bond for the Rifle Gravel Pit <br /> will be $85,785.60 <br /> Table 7. Reclamation Costs <br /> Activity Description Time Months Cost $ <br /> Backfill of pond to create wetland fringe 1 1,911 <br /> Seeding & Planting of wetland fringe 1 7,900 <br /> Construction of perimeter berms .25 36,489 <br /> Surfacing of perimeter berms with topsoil 1 7,170 <br /> Seeding of berms with upland seed mix 1 3,900 <br /> Surface prep and seeding of Operations Area .1 9,650 <br /> Sub-Total .75 67,020 <br /> DRMS Costs <br /> 28% x direct costs) 18,765.60 <br /> Total Bond Amount 85 785.60 <br /> 65 <br />
The URL can be used to link to this page
Your browser does not support the video tag.