My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-04-20_REVISION - M2021052
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2021052
>
2022-04-20_REVISION - M2021052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2022 8:45:12 PM
Creation date
4/21/2022 9:58:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021052
IBM Index Class Name
Revision
Doc Date
4/20/2022
Doc Name
Request For Amendment To Permit
From
IHC Scott, Inc
To
DRMS
Type & Sequence
AM1
Email Name
CCW
THM
SMS
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rifle Gravel Pit#1 April 2022 <br /> Table 2. Estimated Timetable for Phases 1-4 Activities. <br /> Phase/Stage Estimated Estimated Type of Overburden <br /> Duration Depth <br /> Phase 1 Approx. 0.5 Clay and silt; about 6" to 1-foot of topsoil, medium <br /> Site Development 1-2 months feet to 1 foot stiff, slightly moist, brown <br /> & Grading <br /> Phase 2 2-6 months N/A No additional overburden will be removed during <br /> MiningPreparation this phase. <br /> Phase 3 3 - 5 years 17—21 feet Varies <br /> Mining Extraction <br /> 21 feet See Boring 4 Remove estimated 6" of clay and <br /> 30% 1 — 1.5 years (gravel layer silt; gravel layer estimated at 1 foot to 22 feet <br /> thickness) below surface. <br /> 21 feet See Boring 3. Remove estimated 5.5 feet to 6 feet <br /> 60% 1 — 1.5 years (gravel layer of clay and silt overburden; gravel layer estimated <br /> thickness) at 7 feet to 27 feet below surface. <br /> 21 feet See Boring 3. Remove estimated 5.5 feet to 6 feet <br /> 100% 1 — 1.5 years (gravel layer of clay and silt overburden, gravel layer estimated <br /> thickness) at 7 feet to 27 feet below surface. <br /> Phase 4 <br /> (Final 6 months NA NA <br /> Reclamation) <br /> The depths and thicknesses are estimated and based upon the nearest exploratory boring logs included in Attachment C. <br /> 33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.