Laserfiche WebLink
Rifle Gravel Pit#1 April 2022 <br /> See Section 6 for additional information regarding reclamation of the property. <br /> 5.3 Mining Timetable <br /> At this time, the proposed mine would operate daily, with excavation and processing <br /> occurring 8 months of the year(roughly April—November) beginning in July 2022. Total <br /> recoverable volume is estimated at approximately 292,810 CY of aggregate, which is <br /> expected to support operations for between three and five years. <br /> Table 2 provides a range of the duration of mining by phase/stage, estimated nature, depth <br /> and thickness of the deposit to be mined and type of overburden to be removed. <br /> Attachment C includes the exploratory boring logs and material information. <br /> 32 <br />