Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task#TTT Page 3 of 3 <br /> Haul Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> Haul Time: CHTime minutes <br /> Return Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> Return Time: CRTime minutes <br /> Total Truck Cycle Time: CTTCTime minutes <br /> Loading Tool unit <br /> Production CLTUP LCY/Hour Adjusted for job efficiency: CALTUP LCY/Hour <br /> Truck Unit Production <br /> CTUP LCY/Hour Adjusted for job efficiency: CATUP LCY/Hour <br /> Optimal No.of Trucks: CTNS Truck(s) Selected Number of Trucks: CSNT Truck(s) <br /> Adjusted hourly truck team production: CAHTTP LCY/Hour <br /> Adjusted single truck/loader team production: CASTTP LCY/Hour <br /> Adjusted multiple truck/loader team production: CAMTTP LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: CFLeet Team(s) Total job time: CTJT Hours <br /> Unit cost: CUnitCost /LCY Total job cost: CTJC <br /> CIRCES Cost Estimating Software <br />