Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task#TTT Page 2 of 3 <br /> Truck Bed(volume)Basis: <br /> Struck Volume: CSVOL LCY <br /> Heaped Volume: CHVOL LCY <br /> Average Volume: CAVOL LCY <br /> Adjusted Volume: CADJV LCY <br /> Final Truck Volume Based on Number of Loader Passes: CFTVBNLP LCY <br /> Loading Tool Capacity <br /> Bucket Size Class: CBSc <br /> Rated Capacity: CRCap LCY(heaped) <br /> Bucket Fill Factor: CBFF CBFm <br /> Adjusted Capacity: CADJC LCY <br /> Job Condition Corrections: Site Altitude(ft.): CASA feet <br /> Truck Loader Source <br /> Altitude Adj: CACFR CACFD CACFS <br /> Job Efficiency: CJECFR CJECFD CACFS <br /> Net Correction: CNetCR CNetCD <br /> Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill Truck: CNLTPRFT passes <br /> Excavators and Front Shovels: <br /> Machine Cycle Time vs.Job Condition Rating: CBJCD <br /> Selected Value within this Basic Rating: CSBJCD <br /> Track Loaders—Material Description: CTLMaterialDescription <br /> Cycle Time Elements(min.): <br /> Load: CLCTE Maneuver: CMCTE Dump: CDCTE <br /> Wheel and Track Loaders-Unadjusted Basic Loader Cycle Time(load,dump,maneuver): CUBCTime minutes <br /> Cycle Time Factors Factor(min.) Source <br /> Material: CCTmD CCTMF (Cat HB) <br /> Stockpile: CCTsD CCTSF (Cat HB) <br /> Truck Ownership: CCTToD CCTTOF (Cat HB) <br /> Operation: I CCToD CCTOF (Cat HB) <br /> Dump Target: I CCTdTD CCTDTF (Cat HB) <br /> Net Cycle Time Adjustment: CNCT minutes <br /> Adjusted Loader Cycle Time: CABCT minutes <br /> Net Load Time per Truck: CNLTPT minutes <br /> Truck Cycle Time: <br /> Truck Exchange Time: CUTET Minutes Adjusted for site altitude: CATET Minutes <br /> Truck Load Time: CUTLT Minutes Adjusted for site altitude: CATLT Minutes <br /> Truck Maneuver and Dump Time: CUTMDt Minutes Adjusted for site altitude: CATMDt Minutes <br /> Truck Travel(Haul&Return)Time: Road Condition: CRoadCondition <br /> CIRCES Cost Estimating Software <br />