My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-04-14_GENERAL DOCUMENTS - C1981028
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981028
>
2022-04-14_GENERAL DOCUMENTS - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2022 3:08:54 PM
Creation date
4/15/2022 3:03:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
General Documents
Doc Date
4/14/2022
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Coors Energy Company
Type & Sequence
RN8
Permit Index Doc Type
Findings
Email Name
RDZ
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont'd Task#TTT Page 2 of 2 <br /> Cycle Time: <br /> Scraper Loading Time: CLoadingTime Minutes <br /> Maneuver and Spread Time: CMSTime Minutes <br /> Job Condition Correction: Site Altitude:CASA feet <br /> Scraper Push Dozer Source <br /> Altitude Ad': CACFR CACFD CACFS <br /> Job Efficiency: CJECFR CJECFD CACFS <br /> Net Correction: CNetCR CNetCD <br /> Travel Time: <br /> Road Condition: CRoadCondition <br /> Haul Route: <br /> Seg# Haul Distance(Ft) Grade Roll.Res Total Res Velocity(fpm) Travel Time <br /> (%) (%) (%) (min) <br /> Haul Time: CHTime minutes <br /> Return Route: <br /> Seg# Haul Distance(Ft) Grade Roll.Res Total Res Velocity(fpm) Travel Time <br /> (%) (%) (%) (min) <br /> Return Time: CRTime minutes <br /> Total Scraper team cycle time: CTSTCT minutes <br /> Adjusted for job conditions: CAJC LCY/Hour <br /> Selected Number of Scrapers: CSNS Scraper(s) <br /> Adjusted single scraper team(unit)hourly production: CASST LCY/Hour <br /> Adjusted multiple scraper team(fleet)hourly production: CAMST LCY/Hour <br /> Unadjusted unit production/hour: CUUP LCY/Hour <br /> Optimal Number of Scrapers per push dozer: CONS <br /> JOB TIME AND COST <br /> Fleet size: CFLeet Team(s) Total job time: CTJT Hours <br /> Unit cost: CUnitCost /LCY Total job cost: CTJC <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.