My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-04-14_GENERAL DOCUMENTS - C1981028
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981028
>
2022-04-14_GENERAL DOCUMENTS - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2022 3:08:54 PM
Creation date
4/15/2022 3:03:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
General Documents
Doc Date
4/14/2022
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Coors Energy Company
Type & Sequence
RN8
Permit Index Doc Type
Findings
Email Name
RDZ
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont'd Task#TTT Page 1 of 2 <br /> SCRAPER TEAM WORK <br /> Task description: Backrdl B-Pit <br /> Site: Keenesburg Strip Mine Permit Action: RN8 Permit/Job#: C1981028 <br /> PROJECT IDENTIFICATION <br /> Task#: A01 State: Colorado Abbreviation: None <br /> Date: 7/13/2021 County: Weld Filename: C28-A01 <br /> User: RDZ <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShift basis: CShift <br /> Equipment Description <br /> -Scraper: CBasicMachine <br /> -Dozer: CDozer <br /> Support Equipment-Load Area: CLoadArea <br /> -Dump Area: CDumpArea <br /> Road Maintenance—Motor Grader: CGrader <br /> -Water Truck: CWaterTruck <br /> Cost Breakdown: Scraper Work Team Support E ui ment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: CSUM CDUM CLAUM CDAUM CMGUM CWTUM <br /> Ownership cost/hour: CSOW CDOW CLAOW CDAOW CMGOW CWTOW <br /> Operating cost/hour: CSOP CDOP CLAOP CDAOP CMGOP CWTOP <br /> %Utilization-ripper: CSRU CDRU CLARU CDARU CMGRU CWTRU <br /> Ripper own.cost/hour: CSRW CDRW CLARW CDARW CMGRW CWTRW <br /> Ripper op.cost/hour: CSRO CDRO CLARO CDARO CMGRO CWTRO <br /> Operator cost/hour: CSPR CDOR CLAOR CDAOR CMGOR CWTOR <br /> Unit Subtotals: CSUS CDUS CLAUS CDAUS CMGUS CWTUS <br /> Number of Units: CSNU CDNU CLANU CDANU CMGNU CWTNU <br /> Group Subtotals: Work: CWork Support: CSupport Maint: CMaint <br /> Total work team cost/hour: CTotalWorkTeamCost <br /> MATERIAL QUANTITIES <br /> Initial volume: CInitVolume CCY Swell factor: CSwell <br /> Loose volume: CLooseVolume LCY <br /> Source of estimated volume: CSourceEV <br /> Source of estimated swell factor: CSourceSwell <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: CMaterialWeight lbs/LCY Struck Volume: CSVOL LCY <br /> Material description: CMaterialDescription Heaped Volume: CHVOL LCY <br /> Rated Payload: CRatedPayload pounds Average Volume: CAVOL LCY <br /> Payload Capacity: CPayloadCapacity LCY Adjusted Capacity: CADJC LCY <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.