MT8 2.05-27 Revised 02/28/22 <br />A second facilities reclamation effort was completed during 2008-2009, with demolition and reclamation of a number <br />of additional buildings and structures and their associated disturbance areas in the No. 5 Portal area, including; the <br />Men’s Bathhouse; Laboratory Trailer and Sample Storage Shed; rock-dust tank; and miscellaneous buildings and <br />facilities (Compressor House and Guard-Shack and Warehouse fencing). Future facilities removal and backfilling and <br />grading of the remaining portions of the No. 5 Mine Portal Area will balance material cuts and fills, utilizing existing <br />materials to achieve the design postmining topography, create stable landforms, and promote effective drainage. <br /> <br />In order to stabilize reclaimed areas and promote plant growth, approximately 6 inches of soil material or best available <br />plant growth media has been or will be replaced on all reclaimed facility areas. The redistributed materials will be <br />analyzed to assess fertility and determine if amendments are required. The replaced materials will be analyzed for <br />nitrogen, phosphorus, and potassium. As shown on the Reclamation Plan Map (Map 29), portions of the No. 5 Portal <br />Area will be revegetated to one of two land uses: 1) Rangeland/wildlife habitat; or 2) Pastureland (hayland). Sloped <br />areas, such as the No. 5 Portal face-up area, will be returned to rangeland/wildlife habitat and flatter areas will be <br />returned to a pastureland (hayland) land use. Generally, revegetation seeding will be completed using a rangeland seed <br />drill. If it is necessary to broadcast seed, the seeding rate will be doubled. Straw mulch, applied at the rate of two tons <br />per acre, was applied over the seeded areas, and either crimped in or applied with a tackifier to minimize wind loss. For <br />all future reclamation, cover crop seeding will be used to stabilize re-soiled areas and provide a stable seedbed. For <br />those facilities and associated disturbance areas reclaimed in both 1996-1998 and 2008-2009, soil material replacement <br />and revegetation seeding were completed at the time of reclamation. <br /> <br />The sediment ponds and associated drainage structures will remain in-place until final release, and will then be <br />removed. Soil materials salvaged from the pond areas will be used to reclaim the ponds. The ponds will be graded <br />to blend into the natural topography and seeded with the pastureland (hayland) seed mixture. <br /> <br />No. 5A/6 Mine Portal Areas <br /> <br />The No. 5A Mine Portal was developed off a highwall from an abandoned surface strip mine to access the “F” Coal <br />Seam. Subsequent development of rock slopes and shafts within the mine provided access to the lower “E” Seam <br />workings of the No. 6 Mine. When operations ceased, and the Mine was placed in Temporary Cessation status in 1995, <br />temporary seals were placed on all mine openings to prevent unauthorized access. The previous surface mining predated <br />the present laws and regulations. As such, surface facility development and construction did not include salvage of soil <br />materials for later reclamation. This soil material deficiency was addressed by conducting an overburden-sampling <br />program (developed in consultation with the CMLRD) to determine if any of the overburden materials would be suitable <br />plant growth media. The results of the overburden-sampling program are provided for reference in Exhibit 27, No. 5A <br />Portal Overburden Sampling Results. The results indicated that the top six inches of weathered overburden could be <br />removed and stockpiled for later use as suitable plant growth media. <br /> <br />All surface structures and facilities have been demolished and removed with the exception of the multi-services building. <br />This included the removal of the ventilation fans, electrical substations, fuel island, compressor building and any <br />miscellaneous materials. Generally, salvageable materials and any non-inert wastes will be removed from the site for <br />salvage or disposal, as appropriate. Inert wastes, including concrete demolition and other debris is being placed either <br />in the No. 5A underground workings near the portal or at the toe of the face-up area prior to backfilling. The portal <br />entries have been sealed consistent with the approved MSHA sealing plans. No toxic or combustible materials will be <br />used as sealing materials. <br /> <br />The portal face-up area will be backfilled with the material from the facilities pad and by grading in the highwall. Prior <br />to initiating backfilling and grading operations, the upper 6 inches of vegetated overburden will be salvaged and <br />temporarily stockpiled adjacent to the site for replacement as suitable plant growth media. On completion of backfilling, <br />the portal area will be rough graded to establish a stable configuration. Contour ditches or furrows will be constructed <br />on the reclaimed slope to reduce erosion and provide for effective drainage. These ditches or furrows will be <br />approximately 20 to 50 feet apart and have check-dams placed at periodic intervals. The ditches will be maintained <br />until the vegetation becomes established. It is anticipated that the ditches would fill with sediment in the initial years