My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-04-04_PERMIT FILE - M2022013 (38)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2022013
>
2022-04-04_PERMIT FILE - M2022013 (38)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2022 8:40:20 AM
Creation date
4/4/2022 4:49:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2022013
IBM Index Class Name
Permit File
Doc Date
4/4/2022
Doc Name Note
Exhibit G - Flood Control Mitigation Plan
Doc Name
Application
From
Varra Companies, Inc.
To
DRMS
Email Name
RDZ
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Two Rivers Gravel Pit Mine <br /> Riverside Berm Failure Analysis <br /> and Flood Control Mitigation Plan <br /> ' ' ' January 22,2020 <br /> * Interpolated values <br /> USGS Gage Data <br /> 1. Big Thompson Stafiorr 06741510 at LCR 13C <br /> 40 22'43"N,105 03-38"W <br /> Peak not recorded;maximum discharge of 4250 cfs at 1845 hrs on Sept 12 2013 <br /> USGS B6741510 BIG THOMPSON RIVER AT LOVELAND, CO, <br /> 5000 <br /> v 4BBB <br /> c 3BBB <br /> m 2BBB <br /> N <br /> a 1BAB <br /> iA <br /> Y <br /> Y <br /> u <br /> .y <br /> 7 <br /> u <br /> lee <br /> L <br /> JR <br /> .y <br /> � 2e <br /> Sep Sep Sep Sep Sep Sep Sep Sep <br /> 16 11 12 13 14 15 16 17 <br /> 2013 2813 2013 2013 2013 2013 2013 2013 <br /> ---- Provisional Data Suhject to Revision ---- <br /> Median daily statistic (34 years) ' Measured discharge <br /> Discharge <br /> NOTES <br /> Methodology. <br /> This procedure done so that HG for WinDAM C can be based on an actual flood.The September 2013 Big Thompson flood HG was used because, (1) it was available, (2)was produced <br /> by a large rainstorm in the foothills, and (3) Qp similar to 100-yr flood which is used for WinDAM C design flood. <br /> A flood hydrograph for the September 2013 South Platte River flood near Greeley(closest to the site) is not available. The closest gage is at Kersey but was damaged during the flood <br /> on September 14, 2013 ("Flooding in the South Platte River and Fountain Creek Basins in Eastern Colorado, September 9-18, 2013, Robert Kimbrough and Robert Holmes,Jr.) . Due to <br /> such, and for the purpose of this study, it was assumed that the Big Thompson River hydrograph mentioned above is a reasonable representation of the South Platte River.The Big <br /> Thompson River, in addition to several similar rivers that flow from the foothills into the South Platte River, are tributary to the South Platte River which would reflect their hydrographs. <br /> The hydrograph ordinates were proportioned to the FEMA FIS 100-yr peak discharge for the South Platte River at Highway 85 which is assumed to be the discharge at Two Rivers for <br /> 100-yr flood; i.e., WinDAM C design flood. <br /> (1) Dates per USGS graph above. <br /> (2) Hour increments so can be entered in WinDAM as such approximates linear, ordinates were spaced several hours apart for simplicity. <br /> (3) Qs from USGS graph above. Linear extrapolation on both rising and falling limb. <br /> (4) Column (4) proportioned to design Q of 32,500 cfs at Two Rivers (Q100 for South Platte R at HWY 85/Q100 for Big Thompson R at Loveland per graph above (32,500/6,000)). Peak <br /> discharge for Big Thompson R at Loveland not recorded and extrapolated from graph. <br /> (5) Discharge that enters site is (4) 100-yr Q less 10-yr discharge for both Big Thompson and S. Platte Rivers. It is assumed that flows less than 10-yr floods are controlled by berm that <br /> surrounds the site. BTR Q10 = 2,500 cfs; SPR Q10 = 11,000 cfs;Total Q10 = 13,500 cfs. <br /> (6) Q proportioned between Big Thompson floodplain and South Platte floodplain. BT Qp= 8,000 cfs at confluence with SP. SP Qp= SP Q100 at Hwy 85 =32,500 cfs.Then BT Qp at <br /> confluence=32,500 -8,000 = 24,500 cfs. Ratio of Qp= 24,500/8,000 =3.1 (say, 3).Then, Q ordinates= (5)/3. p9 28(7) (5) -(6)• <br /> (8) (7) -6,000 cfs. Based on 1,000 cfs entering each of 6 groins. Inflow channel to groin is 1,000 cfs as in Coulson. Values about the same as for NW Pit runs, so left NW Pit HG in Central <br /> Pit Berm Sizing WinDAM (file copied from NW Pit Best) because its output more reasonable. <br />
The URL can be used to link to this page
Your browser does not support the video tag.