Laserfiche WebLink
Two Rivers Gravel Pit Mine <br /> Riverside Berm Failure Analysis <br /> and Flood Control Mitigation Plan <br /> ' ' ' January 22,2020 <br /> TWO RIVERS <br /> DESIGN HYDROGRAPHS (WINDAM C INPUT HGs) <br /> FOR <br /> REPRESENTATIVE HEADCUT AT BIG THOMPSON SIDE AND SOUTH PLATTE SIDE PITS <br /> BT Side SP Side SP BT <br /> Date Time Q Adjusted Q Adjusted Q- Q Q WinDAM WinDAM <br /> (hr) (cfs) (cfs) 10-yr Q (cfs) (cfs) Headcut Headcut <br /> (1) (2) (3) (4) (5) (6) (7) (8) (9) <br /> 9/12/13 2400 0 100 540 0 0 0 <br /> 4 500 * 167 333 <br /> 8 1,500 * 500 1,000 <br /> 10:00 12 3,000 16,200 2,700 900 1,800 <br /> 16 6,000 * 2,000 4,000 0 <br /> 18:45 20 4,250 22,950 9,450 3,150 6,300 300 <br /> 9/13/13 1:00 24 5,000 27,000 13,500 4,500 9,000 3,000 <br /> 32 15,000 * 5,000 10,000 4,000 <br /> 36 15,500 * 5,167 10,333 4,333 <br /> 40 17,000 * 5,667 11,333 5,333 <br /> 44 18,000 * 6,000 12,000 6,000 <br /> 9/14/13 12:00 48 6,000 32,400 18,900 6,300 12,600 6,600 <br /> 52 17,500 * 5,833 11,667 5,667 <br /> 56 16,000 * 5,333 10,667 4,667 <br /> 60 15,000 * 5,000 10,000 4,000 <br /> 64 14,000 * 4,667 9,333 3,333 <br /> 68 13,000 * 4,333 8,667 2,667 <br /> 72 11,500 * 3,833 7,667 1,667 <br /> 76 10,000 * 3,333 6,667 667 <br /> 80 9,000 * 3,000 6,000 0 <br /> 84 7,500 * 2,500 5,000 <br /> 88 7,000 * 2,333 4,667 <br /> 92 5,500 * 1,833 3,667 <br /> 9/16/13 15:00 96 3,400 18,360 4,860 1,620 3,240 <br /> pg. 27 <br />