My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-03-23_PERMIT FILE - M2021059
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021059
>
2022-03-23_PERMIT FILE - M2021059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2022 9:39:25 AM
Creation date
3/23/2022 9:31:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021059
IBM Index Class Name
Permit File
Doc Date
3/23/2022
Doc Name
Adequacy Review Response #2
From
Telesto
To
DRMS
Email Name
PSH
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
To: Mr. Peter Hays <br />Date: March 21, 2022 <br />Page 9 <br /> <br /> 20220314_DRMS_Adequacy_Review_Response_MASTER.docx <br /> <br />Response 16 <br />Field parameters are not measured while purging because over three-borehole volumes are <br />removed from the monitoring well during the sampling events. Field parameters are taken <br />at the time of sampling and recorded on the field sheets. <br />Comment 20 <br />In Appendix D, page 15-16, the Applicant states groundwater level and quality samples <br />will be collected from all monitoring wells on quarterly basis. After one year the Applicant <br />may approach the Division seeking to modify the plan along with justification for the <br />modification. In the Groundwater Sampling and Analysis Plan Section 5.0, page 2, the plan <br />states groundwater quality samples will only be collected from select wells and those wells <br />are listed in Table 1. Table 1 only lists five wells to be sampled. Please explain the <br />discrepancy and update accordingly. The Division is expecting all monitoring wells to be <br />sampled on quarterly basis. <br />Response 20 <br />We revised Appendix D to reflect that we will collect water levels from all monitoring <br />wells monthly, and water quality samples from the five wells listed in Table 1, quarterly. <br />We cleaned up language in Appendix D in hopes of clearly showing the purpose of each <br />monitoring well. Attachment 10 provides this revision. <br />DUNN PIT (PERMIT NO. M-2021-059), SECOND ADEQUACY <br />REVIEW ADDRESSING REPONSES FROM TELESTO <br />SOLUTIONS, INC., 21 FEBRUARY 2022 – MEMO FROM ROB <br />ZUBER, DRMS TO PETER HAYS, DRMS <br />Comment 3 <br />The Telesto report states that, “The flood stage during the 100-year event is below the <br />elevation of the bridge girders for both the railroad and highway bridges.” Does the 1D <br />model confirm this statement? If so, please provide an image from the model results (the <br />cross section at the upper end of the railroad bridge) illustrating this point. If the 1D model <br />does not confirm this statement, please explain the possible discrepancy between the model <br />and the statement. <br />Response 3 <br />The 1D model confirms this statement. Please see the figures in Attachment 11.
The URL can be used to link to this page
Your browser does not support the video tag.