My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-03-23_PERMIT FILE - M2021059
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021059
>
2022-03-23_PERMIT FILE - M2021059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2022 9:39:25 AM
Creation date
3/23/2022 9:31:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021059
IBM Index Class Name
Permit File
Doc Date
3/23/2022
Doc Name
Adequacy Review Response #2
From
Telesto
To
DRMS
Email Name
PSH
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Loveland Ready-Mix, Concrete, Inc. 9 September 2021 <br />updated_exhibits_d.docx <br /> <br />6.5 Timing of Mining and Reclamation <br />As required by Sub-section 6.4.4(e) of the Rules and Regulations, an approximate timetable <br />to describe the mining operation is needed. The timetable establishes the relationship <br />between mining and reclamation during the different phases of a mining operation. <br />Mining operations are anticipated to begin soon after all permits are in place. The <br />extraction rates are expected to be approximately 200,000 tons of construction material per <br />year. Production rates will vary depending on market demands. LRM plans to conduct <br />concurrent reclamation as mining progresses. Mining and reclamation are planned in five- <br />acre increments. This will allow for safe and efficient operations with detail to slope <br />stability and concurrent reclamation Exhibit C. <br />Cell 1/C1 <br />Mining will begin with Cell C1 for the first 10 to 12 years of operation. Approximately 37 <br />acres will be mined in 7 phases during this time with a total of 2,166,145 tons of gravel. <br />Cell 3/C3 <br />Mining will continue into C3 and will last about 8 years. Cell C3 is approximately 28 <br />acres, will be mined in 5 phases to the mining access road; mining will then begin at Cell <br />2. As Cell 2 is nearing completion, mining will recommence on Cell 3 along the west side <br />of the access road working from north to south. Cell 3 will generate 1,717,639 tons of <br />gravel. <br />Cell 2/C2 <br />Once mining reaches the access road from Cell 3, mining will be focused on Cell 2. Cell <br />2 will be conducted in 3 phases. Cell C2 is approximately 11 acres, will be mined in 4 <br />phases and take a little over 3 years for a total of 661,565 tons of gravel. The operator will <br />comply with the performance standards of Section 3.1 and this operation is not intended to <br />be an intermittent operation as defined in Section 34-32.5-103(11)(b), C.R.S.
The URL can be used to link to this page
Your browser does not support the video tag.