My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-03-21_PERMIT FILE - M2022012
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2022012
>
2022-03-21_PERMIT FILE - M2022012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2025 5:52:19 AM
Creation date
3/23/2022 8:45:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2022012
IBM Index Class Name
Permit File
Doc Date
3/21/2022
Doc Name
Application
From
Burton Farms LLLP
To
DRMS
Email Name
CCW
THM
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Burton Farms Gravel Pit: • <br /> Exhibit D-1 : Reclamation Plan Map* - <br /> Reclamation Plan: <br /> -3H:1V slopes and pit <br /> Schuch&Schmidt floor to be covered in 6" <br /> CR 15 Ditch crusher fines, followed by <br /> 4" of Topsoil/Growth <br /> 15 Approximate location of Medium,then reseeded <br /> existing M-1987-013 (green with approved seed mix. <br /> Subject Property dashed line) to be mined by -10HAV slopes and <br /> Boundary(blue line) adjacent operator remaining disturbed areas <br /> to be ripped, prepped, <br /> 31-1:1V slopes ending at and reseeded with <br /> Existing Access Road existing pit floor elevation approved seed mix. <br /> (yellow arrows) <br /> (not part of <br /> permitted area) <br /> (approx. 1,041' from Approximate existing pit <br /> CR 15 to Extraction floor after excavation <br /> Site Boundary; (dashed lines) <br /> approx. 12' wide) <br /> To be covered in 6" <br /> crusher fines, followed by <br /> 4" of Topsoil/Growth <br /> Medium then reseeded <br /> '•• <br /> with approved seed mix <br /> Extraction Site <br /> Entrance •• ` ..(green shading) <br /> Lat: 37`41'47.71"N <br /> Long: 106' <br /> 21'48.74"W " 10H:1V (or flatter) slopes to <br /> `- <br /> w t , 4` Boundary of Extraction Site <br /> Boundary of ,' (orange arrows) <br /> Extraction Site (9.99 ' <br /> sq. ac) (red line) <br /> Remaining disturbed areas to <br /> be ripped, prepped, and <br /> reseeded with approved seed <br /> mix(purple shading) <br /> Prepared 12/15/2021 by Sarah Ostby,Paralegal,Holsinger Law,LLC -y- <br />
The URL can be used to link to this page
Your browser does not support the video tag.