My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-03-21_PERMIT FILE - M2022012
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2022012
>
2022-03-21_PERMIT FILE - M2022012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2025 5:52:19 AM
Creation date
3/23/2022 8:45:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2022012
IBM Index Class Name
Permit File
Doc Date
3/21/2022
Doc Name
Application
From
Burton Farms LLLP
To
DRMS
Email Name
CCW
THM
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
toe of the west slope and covered with two feet of native rock or waste rock material prior to <br /> placement of growth medium. <br /> (2) Reclamation Cost Estimates: <br /> The site will reach a point of maximum disturbance when rock material to be mined is depleted, <br /> however, the site is currently at its maximum liability point since further mining will actually <br /> reduce the highwalls and steep slopes that exist in the extraction area. The following tasks, <br /> including unit and total costs, may be necessary to accomplish reclamation in its current state. <br /> Reclamation Task and Quantity Unit Cost Total Cost <br /> Grading <br /> Reduce Highwall-Combination of Blasting and $2.00/yd $4,000.00 <br /> Grading <br /> Rough Grading 5 acres(Rough grading will occur $200/acre $1,000.00 <br /> once Highwalls are reduced and concrete from scale is <br /> placed to prepare site for Overburden/Growth <br /> Medium replacement) <br /> Overburden&Topsoil Replacement <br /> Overburden-4,000 cu yds over 5 acres of slopes and $2.00/yd $8,000.00 <br /> floor of Pit <br /> Growth Medium-2,700 cu yds over 5 acres(Haul and $2.00/yd $5,400.00 <br /> place using front end loader and truck) <br /> Topsoil Preparation for Seedbed <br /> Rip 5 acres of roads/stockpile areas w/dozer or grader $200.00/ac $1,000.00 <br /> Prepare 10 acres of seedbed with Disc/Harrow etc. $50/ac $500.00 <br /> Seeding <br /> Seed Cost-10 acres $150.00/acre $1,500.00 <br /> Drill Seeding- 10 acres $50.00/acre $500.00 <br /> %25 Failure rate replacement seeding $500.00 $500.00 <br /> Other T <br /> Mobilization/Demobilization $1,000.00 <br /> Total Direct Costs $23,400.00 <br /> DRMS Indirect Cost 23.5%of Direct Cost $5,499.00 <br /> Total Financial Warranty $28,899.00 <br /> Attachments: <br /> Exhibit D-1: Reclamation Plan Map <br /> Burton Farms LLLP Page 5 of 5 <br /> Construction Materials Limited Impact(I 10(c))Operation Reclamation Permit Application Form <br />
The URL can be used to link to this page
Your browser does not support the video tag.