Laserfiche WebLink
Cost Summary Worksheet Cont'd Task 4 022 Page 8 of 8 <br /> `*two round trips with haul rig: <br /> Total Roadable Mob/Demob Cost** <br /> **one round trip,no haul rig: $1.03 <br /> Transportation Cycle Time: <br /> Non- <br /> Roadable Roadable <br /> Equipment Equipment <br /> Haul Time(Hours): 0.04 0.04 <br /> Return Time(Hours): 0.04 0.04 <br /> Loading Time(Hours): 0.30 NA <br /> Unloading Time(Hours): 0.30 NA <br /> Subtotals: 0.68 0.08 <br /> JOB TIME AND COST <br /> Total job time: 1.36 Hours <br /> Total job cost: $2,053 <br /> CIRCES Cost Estimating Software <br />