My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-03-18_REVISION - M2018029
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2018029
>
2022-03-18_REVISION - M2018029
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2022 11:34:28 AM
Creation date
3/22/2022 7:59:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018029
IBM Index Class Name
Revision
Doc Date
3/18/2022
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Bernard (Joe) Montoya White Wolf Construction & Landscaping, LLC
Email Name
JLE
CJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Summary Worksheet Cont'd Task#022 Page 7 of 8 <br /> EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> Task description: Mobilization <br /> White Wolf Construction Permit Action: <br /> Site: Borrow Pit 2022 Bond Calculation Permit/Job#: M2018029 <br /> PROJECT IDENTIFICATION <br /> Task#: 004 State: Colorado Abbreviation: None <br /> Date: 3/16/2022 County: Las Animas Filename: M029-006 <br /> User: CID <br /> Agency or organization name: DRMS <br /> EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: 1 per day <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR,6X4,DIESEL POWERED, <br /> 400 HP(2ND HALF,2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK,DROP DECK EQUIPMENT <br /> TRAILER(25T,50T,AND 100T) <br /> Cost Breakdown: <br /> Available Rig Capacities 0-25 Tons 26-50 Tons 51+Tons <br /> Ownership Cost/Hour: $21.28 $37.94 $47.67 <br /> Operating Cost/Hour: $26.55 $50.48 $56.21 <br /> Operator Cost/Hour: $20.54 $20.54 $20.54 <br /> Helper Cost/Hour: $0.00 $23.53 $23.53 <br /> Total Unit Cost/Hour: $68.37 $132.49 $147.95 <br /> NON ROADABLE EQUIPMENT: <br /> Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br /> Description Unit Cost/hr/unit Cost/hr/unit Size Cost/hr/ Cost/hr/fleet Cost/fleet <br /> (TONS) fleet <br /> CatD8T-8SU 53.08 $112.65 $147.95 1 $260.60 $147.95 $250.00 <br /> DnI/Broadcast 25.00 $7.98 $68.37 2 $152.70 $136.74 $500.00 <br /> Seeder with <br /> Tractor <br /> Subtotals: 1 $413.30 $284.69 $750.00 <br /> ROADABLE EQUIPMENT: <br /> Machine Description Total Cost/hr/ Fleet Size Haul Trip Return Trip <br /> unit Cost/hr/fleet Cost/hr/fleet <br /> Light Duty Pickup,4A,3/4 T. $12.93 1 $12.93 $12.93 <br /> Subtotals: $12.93 $12.93 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: SEGUNDO <br /> Total one-way travel distance: 1.00 miles <br /> Average Travel Speed: 25.00 mph <br /> Total Non-Roadable Mob/Demob Cost* $2,051.80 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.