My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-03-18_REVISION - M2018029
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2018029
>
2022-03-18_REVISION - M2018029
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2022 11:34:28 AM
Creation date
3/22/2022 7:59:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018029
IBM Index Class Name
Revision
Doc Date
3/18/2022
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Bernard (Joe) Montoya White Wolf Construction & Landscaping, LLC
Email Name
JLE
CJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Summary Worksheet Cont'd Task#022 Page 2 of 8 <br /> BULLDOZER WORK <br /> Task description: Grade slopes to 3H:1V <br /> White Wolf Construction Permit Action: <br /> Site: Borrow Pit 2022 Bond Calculation Permit/Job#: M2018029 <br /> PROJECT IDENTIFICATION <br /> Task#: 001 State: Colorado Abbreviation: None <br /> Date: 3/10/2022 County: Las Animas Filename: M029-002 <br /> User: CID <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D8T-8SU <br /> Horsepower: 310 <br /> Blade Type: Semi-Universal <br /> Attachment: 3-shank ripper <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $97.46 NA <br /> Operating Cost/Hour: $97.63 100 <br /> Ripper own. $15.19 NA <br /> Cost/Hour: <br /> Ripper op.Cost/Hour: $4.97 50 <br /> Operator Cost/Hour: $41.30 NA <br /> Total unit Cost/Hour: $256.55 <br /> Total Fleet Cost/Hour: $256.55 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 53 <br /> Swell factor: 1.000 <br /> Loose volume: 53 LCY <br /> Source of estimated volume: 6ft avg.height highwall. 150 ft highwall length.3H:IV. <br /> Source of estimated swell Cat Handbook <br /> factor: <br /> HOURLY PRODUCTION <br /> Average push distance: 50 feet <br /> Unadjusted hourly 1,400.0 LCY/hr <br /> production: <br /> Materials consistency Rock,poorly ripped or blasted 0.6 <br /> description: <br /> Average push -10% <br /> gradient: <br /> Average site altitude: 6,600 feet <br /> Material weight: 2,650 lbs/LCY <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.