My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-03-18_REVISION - M2018029
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2018029
>
2022-03-18_REVISION - M2018029
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2022 11:34:28 AM
Creation date
3/22/2022 7:59:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018029
IBM Index Class Name
Revision
Doc Date
3/18/2022
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Bernard (Joe) Montoya White Wolf Construction & Landscaping, LLC
Email Name
JLE
CJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: Cost Summary <br /> White Wolf Construction Permit Action: <br /> Site: Borrow Pit 2022 Bond Calculation Permit/Job#: M2018029 <br /> PROJECT IDENTIFICATION <br /> Task#: 022 State: Colorado Abbreviation: None <br /> Date: 3/10/2022 County: Las Animas Filename: M029-022 <br /> User: CJD <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 002 Grade slopes to 31-1:1 V DOZER 1 0.12 $31 <br /> 003 Replace 4-6 inches of topsoil DOZER 1 0.50 $128 <br /> 004 Revegetation REVEGE 1 0.50 $241 <br /> 006 Mobilization MOBILIZE 1 1.36 $2,053 <br /> SUBTOTALS: 2.48 $2,453 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $50 <br /> Performance bond: 1.05 Total= $26 <br /> Job superintendent: 1.24 Total= $89 <br /> Profit: 10.00 Total= $245 <br /> TOTAL O&P= $410 <br /> CONTRACT AMOUNT(direct+O&P)= $2,863 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $500 Total= $500 <br /> Engineering work and/or contract/bid preparation: 4.25 Total= $122 <br /> Reclamation management and/or administration: 5.00 $143 <br /> CONTINGENCY: 0.00 Total= $0 <br /> TOTAL INDIRECT COST= $1,175 <br /> TOTAL BOND AMOUNT(direct+indirect)= $3,628 <br />
The URL can be used to link to this page
Your browser does not support the video tag.