Laserfiche WebLink
March 1,2022 C-2010-089/New Horizon North Mine JHB <br /> RECLAMATION SUCCESS-Rule 4.15,Rule 3: <br /> The pastures, Irrigated pasture and Dryland pasture look ready for the upcoming growing season. Other <br /> than minor treatment of the settlement crack on the north side of the irrigated pasture,the Division is not aware of <br /> any critical repairs required prior to the 2022 growing season. <br /> TOPSOIL—Rule 4.06 <br /> Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3;Redistribution 4.06.4: <br /> The topsoil stockpiles have ring ditches around the bases of the piles. The topsoil stockpiles arear stable <br /> with no problems noted. <br /> DOCUMENTS RECEIVED NA <br /> OTHER(SPECIFY)NA <br /> ENFORCEMENT ACTIONS/COMPLIANCE <br /> No enforcement actions were initiated as a result of this inspection,nor are any pending. <br /> Number of Partial Inspection this Fiscal Year: 5 <br /> Number of Complete Inspections this Fiscal Year: 3 <br /> Page 3 of 5 <br />