Laserfiche WebLink
vantage points. Ditch D2 was walked however limited visibility of the ditch could be observed due to snow cover. <br /> Overall,no issues were observed with any ditch associated with the Collom Pit. <br /> F t 0,13'Y <br /> X <br /> Section 25 Pond. Section 26 Pond and Ditch D I. <br /> Gossard Pond. <br /> GENERAL MINE PLAN COMPLIANCE: <br /> Highwall mining was activities were ongoing at the Collom Pit and continues moving south up the Collom Gulch. <br /> The highwall miner is entering along the west facing slope and mining in the eastern direction. <br /> SIGNS AND MARKERS—Rule 4.02: <br />