My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-03-01_INSPECTION - C1996084
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1996084
>
2022-03-01_INSPECTION - C1996084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2022 10:39:00 AM
Creation date
3/2/2022 10:16:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Inspection
Doc Date
3/1/2022
Doc Name
Inspection Report
From
DRMS
To
New Elk Coal Company, LLC
Inspection Date
2/24/2022
Email Name
JLE
CJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 24,2022 C-1996-084/Lorencito Canyon Mine JLE <br /> _ =-�-�__- - tee!', -- ..,,_ ,�•, <br /> Figure 3. Fill 009 <br /> HYDROLOGIC BALANCE -Rule 4.05 <br /> Drainage Control 4.05.1,4.05.2,4.05.3; Siltation Structures 4.05.5,4.05.6; Discharge Structures 4.05.7,4.05.10; <br /> Diversions 4.05.4;Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Surface Water Monitoring 4.05.13; <br /> Drainage—Acid and Toxic Materials 4.05.8;Impoundments 4.05.6,4.05.9; Stream Buffer Zones 4.05.18: <br /> Pond 009 was holding water but not discharging. The primary and emergency spillway was clear and functional. <br /> The embankment was stable and vegetated. <br /> Pond 008 was holding water but not discharging. The primary and emergency spillway was clear and functional. <br /> The embankment was stable and vegetated. <br /> Pond 005 was dry and therefore not discharging. The primary and emergency spillway was clear and functional. <br /> Pond 006a was holding water but was not discharging. The primary and emergency spillway was clear and <br /> functional. The embankment was stable and vegetated. <br /> Ditch D7 above pond 006a contains a large amount of sediment. Mr.Massarotti indicated that NECC will clean <br /> out this ditch to insure proper functioning of the ditch. <br /> Pond 007a was not discharging. The primary and emergency spillway was clear and functional. The embankment <br /> was stable and vegetated. <br /> Pond 009a was not discharging. The primary and emergency spillway was clear and functional. The embankment <br /> was stable and vegetated. <br /> Number of Partial Inspection this Fiscal Year: 5 <br /> Number of Complete Inspections this Fiscal Year: 3 <br /> Page 4 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.