My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-03-01_INSPECTION - C1981012
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981012
>
2022-03-01_INSPECTION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2022 10:39:01 AM
Creation date
3/2/2022 10:15:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Inspection
Doc Date
3/1/2022
Doc Name
Inspection Report
From
DRMS
To
New Elk Coal Company, LLC
Inspection Date
2/24/2022
Email Name
JLE
CJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 24,2022 C-1981-012/New Elk Mine JLE <br /> �- <br /> ---------- <br /> Approximate <br /> ewe seam eninina <br /> Location of <br /> Unmined <br /> Area <br /> �azv=n e.x +:sa vrw eLx <br /> # �y� �iwnuF nrm�x <br /> �K-Nsas xE,reLx �GCICEN <br /> L'J sae x �t<cnueu X <br /> �tyea xerc eLx � 50�NE.v ELK 5 <br /> L_u S <br /> �J� E <br /> �sw nett eix It3St6 xEw 8LK c <br /> e <br /> Ike \lmoP�T®aMkrc <br /> 0 P,— NOT FOR ODN3IR=0N NM Elk sf A <br /> W_Sf Ph. 9 <br /> _ e w-Pa e <br /> Figure 3. Map 03, Approved Mining Plan map <br /> NECC was producing coal at the time of the inspection. The raw coal stockpile,the wash plant, and the clean coal <br /> stockpile were active at the time of the inspection. NECC was hauling coal from their main entrance road to <br /> Highway 12 at the time of the inspection and transporting the coal to the Jansen Coal Loadout near Trinidad. <br /> According to Mr.Massarotti,he has placed the required markers at each of the sealed development drill hole sites <br /> approved with TR74. During this inspection,only drill site NE-02-20 was observed. The marker was in place at <br /> this location and included a metal stake with a cap with the borehole designation stamped on the top of the spike. <br /> PROCESSING WASTE/COAL MINE WASTE PILES—Rule 4.10 and 4.11 <br /> Drainage Control; Surface Stabilization; Placement: <br /> Number of Partial Inspection this Fiscal Year: 5 <br /> Number of Complete Inspections this Fiscal Year: 3 <br /> Page 5 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.