My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-03-01_REVISION - M1978357
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1978357
>
2022-03-01_REVISION - M1978357
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2022 7:39:30 AM
Creation date
3/1/2022 11:47:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978357
IBM Index Class Name
Revision
Doc Date
3/1/2022
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Jim Doody - Grand Junction Pipe & Supply Co
Email Name
ACY
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task#OlA Page 2 of 2 <br /> Job efficiency: 0.830 (1 SHIFT/DAY) <br /> Spoil pile: 1.000 (DOZ-OC) <br /> Push gradient: 1.329 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 0.793 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.5904 <br /> Adjusted unit production: 736.17 LCY/hr <br /> Adjusted fleet production: 736.17 LCY/hr <br /> JOB TIME AND COST <br /> Fleet size: 1 Dozer(s) <br /> Unit cost: $0.319/LCY <br /> Total job time: 10.55 Hours <br /> Total job cost: $2,481 <br />
The URL can be used to link to this page
Your browser does not support the video tag.