My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-03-01_REVISION - M1978357
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1978357
>
2022-03-01_REVISION - M1978357
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2022 7:39:30 AM
Creation date
3/1/2022 11:47:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978357
IBM Index Class Name
Revision
Doc Date
3/1/2022
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Jim Doody - Grand Junction Pipe & Supply Co
Email Name
ACY
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task#0IA Page 1 of 2 <br /> BULLDOZER WORK <br /> Task description: Establishing fmal grade <br /> Site: Bradbury Pit Permit Action: 2022 Permit/Job#: M1978357 <br /> PROJECT IDENTIFICATION <br /> Task#: OIA State: Colorado Abbreviation: None <br /> Date: 2/28/2022 County: Mesa Filename: M357-01a <br /> User: ACY <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D8T-8SU <br /> Horsepower: 310 <br /> Blade Type: Semi-Universal <br /> Attachment: NA <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $97.46 NA <br /> Operating Cost/Hour: $97.63 100 <br /> Ripper own.Cost/Hour: $0.00 NA <br /> Ripper op.Cost/Hour: $0.00 1 0 <br /> Operator Cost/Hour: $40.04 NA <br /> Total unit Cost/Hour: $235.13 <br /> Total Fleet Cost/Hour: $235.13 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 6,667 <br /> Swell factor: 1.165 <br /> Loose volume: 7,767 LCY <br /> Source of estimated volume: 500111 of highwall and smooth piles <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Average push distance: 60 feet <br /> Unadjusted hourly production: 1,246.9 LCY/hr <br /> Materials consistency description: Compacted fill or embankment 0.9 <br /> Average push gradient: -15% <br /> Average site altitude: 5,000 feet <br /> Material weight: 2,900 lbs/LCY <br /> Weight description: Decomposed rock-50%Rock,50%Earth <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750 (AVG.) <br /> Material consistency: 0.900 (CAT HB)) <br /> Dozing method: 1.000 (GEN.) <br /> Visibility: 1.000 (AVG.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.