Laserfiche WebLink
S. Describe proposed surface excavation or other land disturbance, including roads, pits, <br /> trenches,waste piles,drill pads and collar areas of underground workings,ponds, etc. <br /> Dirt has been piled in front of main entrance portal. With the use of a mini excavator we <br /> will clear the dirt from the main enterence. Once the dirt is clear we will inspect the <br /> bulkhead door, if needed to gain access to workings we will remove the door and make it <br /> possible to gain access to workings.We will re secure bulkhead door to keep <br /> workings safe and secure. <br /> (Please see attached modification overview for updated plans) <br /> 6. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, <br /> including anticipated number of holes, diameter, depth, location, etc. Submit additional <br /> pages if necessary: <br /> A. Drill Pads: <br /> Average Average <br /> Quantity Width (ft) Length (ft) <br /> B. Drill Holes: <br /> Diameter <br /> Quantity Depth (ft) (in) <br /> C. Mud Pits <br /> Average Average Average <br /> Quantity Width (ft) Length (ft) Depth (ft) <br /> D. Described proposed underground work, including reopening of old workings, <br /> advancement of adits or shafts, trenches, pits, cuts, rock dumps, or other types of <br /> disturbance, describe type,quantity and general dimensions: <br /> Re opening, mapping,verification of existing workings. <br /> (Please see attached modification overview for updated plans) <br /> Form 2—Public File Page 6 of 14 <br />