My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-02-28_REVISION - P2021004
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2021004
>
2022-02-28_REVISION - P2021004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 6:41:03 PM
Creation date
3/1/2022 8:55:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2021004
IBM Index Class Name
Revision
Doc Date
2/28/2022
From
GRE Inc
To
DRMS
Type & Sequence
MD1
Email Name
LJW
THM
SMS
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II. MAPS&DRAWINGS <br /> An accurate topographic base map showing the location of the proposed project must be <br /> submitted with this notice. The prospector may submit a U.S.G.S. 7.5 minute quadrangle, or <br /> similar map of adequate scale that: <br /> 1. Identifies the proposed prospecting site(s) or activity areas involving surface <br /> disturbance. Activity areas include all drill holes, mud pits, excavations, trenches, adits, <br /> shafts,tunnels, rock dumps,stockpiles, impoundments and prospecting roads,and <br /> 2. Includes sufficient detail to identify and locate known prospecting features and facilities <br /> that may be affected and those that are not anticipated to be affected. This includes the <br /> location of all drill holes, mud pits, excavations, trenches, adits, shafts, tunnels, rock <br /> dumps, stockpiles, impoundments and prospecting roads. Color photographs, <br /> adequately labeled (including date,orientation and location), of the prospecting site may <br /> be used to fulfill this requirement if included with the NOI submittal. <br /> III. PROJECT DESCRIPTION <br /> 1. Mineral(s) and/or <br /> Resource(s) being Verify reports of historic mineral deposits,assess conditions of workings and map accessible workings. <br /> Investigated: <br /> 2. Estimated dates of commencement and Commencement: June /27 / 2022 <br /> completion: <br /> Completion July /29 / 2022 <br /> 3. Amount of material (specify units) to be <br /> extracted, moved or proposed to be <br /> moved: (Please see attached Overview for 150 Units Tons <br /> modification estimate material) <br /> Identify the type or method of prospecting proposed and quantity(place an"X") <br /> ❑ Cuts ❑ Pits ❑ Trenches <br /> ❑ Shafts ❑ Tunnels © Adits <br /> ❑ Declines ❑ Air Drilling ❑ Fluid Drilling <br /> ❑ Drilling and Blasting <br /> Form 2—Public File Page 5 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.