Laserfiche WebLink
Bulldozer Worksheet Cont'd Task#02A Page 1 of 2 <br /> BULLDOZER WORK <br /> Task description: Distribute 6"of topsoil over 4 acres of Site A <br /> Site: Surface Rock Pit Permit Action: 2022 Permit/Job#: M1984001 <br /> PROJECT IDENTIFICATION <br /> Task#: 02A State: Colorado Abbreviation: None <br /> Date: 2/24/2022 County: Mesa Filename: MOO 1-02a <br /> User: ACY <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D8T-8SU <br /> Horsepower: 310 <br /> Blade Type: Semi-Universal <br /> Attachment: NA <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $97.46 NA <br /> Operating Cost/Hour: $97.63 100 <br /> Ripper own.Cost/Hour: $0.00 NA <br /> Ripper op.Cost/Hour: $0.00 1 100 <br /> Operator Cost/Hour: $40.04 NA <br /> Total unit Cost/Hour: $235.13 <br /> Total Fleet Cost/Hour: $235.13 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 3,227 <br /> Swell factor: 1.000 <br /> Loose volume: 3,227 LCY <br /> Source of estimated volume: 6"of topsoil over 4 acres <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Average push distance: 100 feet <br /> Unadjusted hourly production: 852.6 LCY/hr <br /> Materials consistency description: Partly consolidated stockpile 1.1 <br /> Average push gradient: 5 % <br /> Average site altitude: 6,600 feet <br /> Material weight: 1,600 lbs/LCY <br /> Weight description: Top Soil <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750 (AVG.) <br /> Material consistency: 1.100 (CAT HB) <br /> Dozing method: 1.000 (GEN.) <br /> Visibility: 1.000 (AVG.) <br />