My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-02-28_REVISION - M1984001
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1984001
>
2022-02-28_REVISION - M1984001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2022 11:56:33 AM
Creation date
2/28/2022 11:48:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984001
IBM Index Class Name
Revision
Doc Date
2/28/2022
Doc Name Note
and Notice of Surety Increase
Doc Name
Reclamation Cost Update
From
DRMS
To
Jim Doody Kilgore Companies LLC dba Elam Construction
Type & Sequence
SI2
Email Name
ACY
THM
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task#OlA Page 2 of 2 <br /> Job efficiency: 0.830 (1 SHIFT/DAY) <br /> Spoil pile: 0.800 (FND-RF) <br /> Push gradient: 1.000 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 0.793 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.3554 <br /> Adjusted unit production: 225.43 LCY/hr <br /> Adjusted fleet production: 225.43 LCY/hr <br /> JOB TIME AND COST <br /> Fleet size: 1 Dozer(s) <br /> Unit cost: $1.154/LCY <br /> Total job time: 76.15 Hours <br /> Total job cost: $19,818 <br />
The URL can be used to link to this page
Your browser does not support the video tag.